Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
North Caucasus-Transcaucasia Gas Pipeline — Tiblisi-Yerevan
Russia, Georgia
- Operator
- Georgian Oil and Gas Corp
- Status
- operating
- Commissioned
- 1988
- Length
- 221.46 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Hrazdan Cement Plant3.7 km · Cement Plant
- Hrazdan thermal power plant4.0 km · Power Plant · 700 MW · gas
- Hrazdan thermal power plant4.0 km · Power Plant · 631 MW · gas
- Argel hydroelectric plant21 km · Power Plant · 224 MW · hydro
On the interactive map
Georgia → Armenia
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)