Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
TGI Pipeline Network — Ballena-Barrancabermeja
- Operator
- TGI SAS E.S.P
- Status
- operating
- Commissioned
- 1996
- Length
- 755.73 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Nueva Cuestecitas14 km · Substation / Converter
- Chivo Mono 1 solar farm15 km · Power Plant · 750 MW · solar
- Cerrejón22 km · Coal / Uranium Mine
Methane observations · within 25 km
- 1,175 kg/hr · coal mine2023-03-18 · 20 km
- 528 kg/hr · coal mine2023-03-18 · 21 km
- Detection · coal mine2023-03-18 · 21 km
- Detection · coal mine2023-03-19 · 20 km
- Detection · coal mine2023-03-19 · 20 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
Portfolio
Colombia → Colombia
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)