Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Karratha to Cape Lambert Pipeline
- Operator
- Mitsui Group, Rio Tinto Group, Hamill Resources Ltd
- Status
- operating
- Commissioned
- 1984
- Length
- 53.41 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Woodside solar farm1.3 km · Power Plant · 450 MW · solar
- Yurralyi Maya power station9.4 km · Power Plant · 200 MW · gas
- Yara Pilbara Ammonia Plant13 km · Chemical Plant
- Pluto LNG13 km · LNG Terminal · 4.9 Mtpa
- Pluto-KPG Interconnector Gas Pipeline15 km · Pipeline
- Pluto LNG Terminal15 km · LNG Terminal · 4.9 Mtpa
- Pluto LNG Terminal15 km · LNG Terminal · 5 Mtpa
On the interactive map
Portfolio
Australia → Australia
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)