Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Subida da Serra Gas Pipeline — Santos-Cubatão
- Operator
- Comgás
- Status
- operating
- Commissioned
- 2024
- Length
- 9.02 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- OSSP Pipeline System — OSSP A 14' Pipeline (SYSTEM/NETWORK ROUTE)2.8 km · Pipeline
- Euzébio Rocha power station2.8 km · Power Plant · 250 MW · gas
- Subestação Baixada Santista3.1 km · Substation / Converter
- Usiminas Cubatão steel plant3.7 km · Iron & Steel Plant
- Yara Cubatao Ammonia Complex5.1 km · Chemical Plant
- Cosan FSRU5.2 km · LNG Terminal · 3.7 Mtpa
- Henry Borden hydroelectric plant6.3 km · Power Plant · 889 MW · hydro
- Subida da Serra Gas Pipeline — Cubatão-São Paulo6.4 km · Pipeline
- Cubatao Cement Plant7.4 km · Cement Plant
- Santos Basin FLNG Terminal10 km · LNG Terminal · 2.7 Mtpa
- Unidade Técnica de Aeronavegação - REDE (SERRAMAR)13 km · Data Centre
- 440 kV line13 km · Transmission Line
On the interactive map
Portfolio
Brazil → Brazil
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)