Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Austria–Slovenia Interconnector (SOL) Gas Pipeline — Entry Murfeld
Austria, Slovenia
- Operator
- Plinovodi doo
- Status
- proposed
- Commissioned
- 2028
- Length
- 27.32 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Austria–Slovenia Interconnector (SOL) Gas Pipeline0 m · Pipeline
- Kainachtal - Maribor837 m · Transmission Line
- Retznei Cement Plant8.4 km · Cement Plant
- Mellach power station12 km · Power Plant · 1.1 GW · gas
- Mellach power station12 km · Power Plant · 246 MW · coal
- 380 kV line12 km · Transmission Line
- Umspannwerk Mellach12 km · Substation / Converter
- Mellach III - Kainachtal / Oststeiermark13 km · Transmission Line
- Umspannwerk Kainachtal/Zwaring15 km · Substation / Converter
On the interactive map
Portfolio
Austria → Slovenia
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)