Pipeline

Adriatica Pipeline — Sestino-Mercato Saraceno (Phase 1)

Italy

Operator
Snam Rete Gas SpA
Status
construction
Commissioned
2026
Length
111.47 km
Commodity
gas

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Portfolio

Italy → Italy

SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)