Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Ramle-Elyakim Gas Pipeline
- Operator
- Israel Natural Gas Lines
- Status
- operating
- Commissioned
- 2017
- Length
- 79.89 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Nesher Ramla power station2.6 km · Power Plant · 120 MW · gas
- Ramla Cement Plant2.7 km · Cement Plant
- 400 kV line3.4 km · Transmission Line
- Gezer power station4.7 km · Power Plant · 1.3 GW · gas
- Cross-Israel Highway solar farm6.0 km · Power Plant · 130 MW · solar
- תחנת משנה גן שורק9.5 km · Substation / Converter
- תחמ״ג איילון11 km · Substation / Converter
- Cyprus – Israel & Palestina interconnection (planned)19 km · Interconnector · 2.0 GW
- Tel Aviv19 km · Data Centre
- תחנת משנה ירקון20 km · Substation / Converter
- Beit Shemesh Cement Plant23 km · Cement Plant
- קו 400 - להבים-עמק שרה25 km · Transmission Line
On the interactive map
Israel → Israel
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)