Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Coal / Uranium Mine
Kennedy No. 3 Deep Coal Mine
- Operator
- Ramaco Resources Inc
- Owner
- Ramaco Resources LLC
- Status
- proposed
- Mineral
- coal
- Commissioned
- 2029
Co-located infrastructure · within 25 km
- Knox Creek Tiller Deep Mine661 m · Coal / Uranium Mine
- Big Creek Mine3.8 km · Coal / Uranium Mine
- SHM26 Coal Mine3.8 km · Coal / Uranium Mine
Methane observations · within 25 km
- 3,286 kg/hr · coal mine2022-01-26 · 5.7 km
- 3,250 kg/hr · coal mine2022-11-24 · 5.7 km
- 2,938 kg/hr · coal mine2023-06-26 · 5.7 km
- 2,932 kg/hr · coal mine2022-03-02 · 5.7 km
- 2,827 kg/hr · coal mine2023-03-25 · 5.7 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Coal Mine Tracker (GCMT) (CC BY 4.0)