Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Ruwais LNG Terminal
7th-largest lng terminal in United Arab Emirates of 12 · top 44% worldwide (#506 of 1,166)
- Operator
- Abu Dhabi Gas Liquefaction Company
- Owner
- TotalEnergies SE, BP PLC, Abu Dhabi Gas Liquefaction Company Ltd, Shell PLC, Mitsui & Co Ltd
- Status
- construction
- Capacity
- 4.8 Mtpa
- Commissioned
- 2029
- Direction
- export
- Commodity
- lng
Comparable lng terminals · United Arab Emirates · 12 ranked
- #1Fujairah LNG Terminal9 Mtpa
- #5Fujairah LNG Terminal4.8 Mtpa
- #6Ruwais LNG Terminal4.8 Mtpa
- #7Ruwais LNG Terminal4.8 Mtpa
- #8Ruwais FSRU3.8 Mtpa
- #9Das Island LNG Terminal2.6 Mtpa
Co-located infrastructure · within 25 km
- Ruwais LNG Terminal0 m · LNG Terminal · 4.8 Mtpa
- 400 kV line4.5 km · Transmission Line
- Jebel Dhanna Terminal6.0 km · Storage / Tank Farm
- Jebel Dhanna / Ruwais6.0 km · Export Terminal
- Ruwais General Utilities Plant8.1 km · Power Plant · 693 MW · gas
- Ruwais General Utilities Plant8.1 km · Power Plant · 230 MW · gas
- Shuweihat S3 Power Station substation8.2 km · Substation / Converter
- Ruwais Refinery8.4 km · Refinery · 817 kb/d
- Shuweihat Power Station substation8.5 km · Substation / Converter
- Shuweihat S2 power plant8.8 km · Power Plant · 1.6 GW · gas
- Ruwais FSRU8.9 km · LNG Terminal · 3.8 Mtpa
- Ruwais substation9.1 km · Substation / Converter
Methane observations · within 25 km
- 1,654 kg/hr · gas or oil plant2023-10-29 · 9.2 km
- 1,230 kg/hr · gas or oil plant2023-10-29 · 9.2 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)