Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Rauma LNG Terminal
- Owner
- Linde PLC
- Status
- idle
- Retired
- 2023
- Direction
- import
- Commodity
- lng
Co-located infrastructure · within 25 km
- HVDC Fenno-Skan9.3 km · Transmission Line
- 400 kV line10 km · Transmission Line
- Rauma sähköasema10 km · Substation / Converter
- Rauma sähköasema10 km · Substation / Converter
- HVDC Fenno-Skan 211 km · Transmission Line
- Olkiluoto nuclear power plant12 km · Power Plant · 3.6 GW · nuclear
- Olkiluoto Reserve power station12 km · Power Plant · 100 MW · oil
- Olkiluodon sähköasema13 km · Substation / Converter
- Eurajoki solar farm18 km · Power Plant · 100 MW · solar
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)