Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Pakistan State Oil LNG Terminal
- Owner
- Pakistan State Oil Co Ltd
- Status
- idle
- Retired
- 2024
- Direction
- import
- Commodity
- lng
Co-located infrastructure · within 25 km
- LNG Easy Floating LNG Terminal2.5 km · LNG Terminal · 1 Mtpa
- Karachi Port Coal Terminal3.1 km · Export Terminal
- Nawabshah-Karachi Gas Pipeline5.7 km · Pipeline
- Iran – Pakistan interconnection6.5 km · Interconnector · 70 MW
- Al-Ayesha Chambers7.3 km · Data Centre
- Disk Masters pakistan Karachi7.5 km · Data Centre
- SSS & Company8.8 km · Data Centre
- Faizan Steel Karachi steel plant9.5 km · Iron & Steel Plant
- Korangi power station17 km · Power Plant · 248 MW · gas
- Bajara-Karachi Loopline17 km · Pipeline
- 500 kV line18 km · Transmission Line
- Gul Ahmed Power Project power plant18 km · Power Plant · 136 MW · oil
On the interactive map
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)