Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Lake Charles LNG Terminal
13th-largest lng terminal in United States of 162 · top 5% worldwide (#53 of 1,166)
- Operator
- Lake Charles LNG Export Company
- Owner
- Lake Charles LNG Company LLC, Lake Charles LNG Export Company LLC
- Status
- proposed
- Capacity
- 17.8 Mtpa
- Commissioned
- 2028
- Direction
- export
- Commodity
- lng
Comparable lng terminals · United States · 162 ranked
- #1Sabine Pass LNG Terminal30.4 Mtpa
- #11Rio Grande LNG Terminal18 Mtpa
- #12Lake Charles LNG Terminal17.9 Mtpa
- #13Lake Charles LNG Terminal17.8 Mtpa
- #14Rio Grande LNG (under construction)17.6 Mtpa
- #15Woodside Louisiana LNG Terminal16.5 Mtpa
Co-located infrastructure · within 25 km
- Lake Charles LNG Terminal0 m · LNG Terminal · 17.9 Mtpa
- Magnolia LNG Terminal2.1 km · LNG Terminal · 4.4 Mtpa
- Magnolia LNG Terminal2.1 km · LNG Terminal · 4.4 Mtpa
- Lake Charles, South - Kaiser Francis Oil and Gas Asset (Louisiana, United States)3.0 km · Oil & Gas Field
- Woodside Louisiana LNG Terminal power station5.2 km · Power Plant · 430 MW · gas
- Calcasieu power station7.1 km · Power Plant · 359 MW · gas
- Creole Trail Pipeline — Main Line7.8 km · Pipeline
- Indorama Ventures Westlake Chemical Plant9.0 km · Chemical Plant
- Westlake Chemical Lake Charles Petrochemical Complex9.3 km · Chemical Plant
- LACC Sulphur Ethylene Plant11 km · Chemical Plant
- RS cogeneration power station11 km · Power Plant · 493 MW · gas
- CP Express Pipeline12 km · Pipeline
Methane observations · within 25 km
- 3,352 kg/hr · LNG terminal2021-04-28 · 10 km
- 1,834 kg/hr2021-04-28 · 8.8 km
- 1,124 kg/hr2021-04-28 · 10 km
- 881 kg/hr · LNG terminal2022-06-18 · 8.6 km
- 815 kg/hr2021-04-28 · 8.8 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)