Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Gulfstream LNG Terminal
122nd-largest lng terminal in United States of 162 · top 50% worldwide (#576 of 1,166)
- Operator
- Gulfstream LNG Development
- Owner
- Gulfstream LNG Development LLC
- Status
- proposed
- Capacity
- 4 Mtpa
- Commissioned
- 2029
- Direction
- export
- Commodity
- lng
Comparable lng terminals · United States · 162 ranked
- #1Sabine Pass LNG Terminal30.4 Mtpa
- #120Magnolia LNG Terminal4.4 Mtpa
- #121Magnolia LNG Terminal4.4 Mtpa
- #122Gulfstream LNG Terminal4 Mtpa
- #123Keyspan LNG Terminal4 Mtpa
- #124Qilak LNG Terminal4 Mtpa
Co-located infrastructure · within 25 km
- Gulfstream LNG power station4.1 km · Power Plant · 275 MW · gas
- Delta LNG Terminal5.9 km · LNG Terminal · 11.3 Mtpa
- Delta LNG Terminal5.9 km · LNG Terminal · 11.3 Mtpa
- Plaquemines LNG Terminal7.3 km · LNG Terminal · 24.8 Mtpa
- Plaquemines LNG Terminal power station7.3 km · Power Plant · 2.1 GW · gas
- Plaquemines LNG Terminal power station7.3 km · Power Plant · 720 MW · gas
- United Bulk Coal Terminal8.8 km · Export Terminal
- United Bulk Coal Terminal8.8 km · Export Terminal
- RAM Terminal11 km · Export Terminal
- Kinetica Energy Express13 km · Pipeline
- Gator Express Gas Pipeline — Phase I15 km · Pipeline
- Gator Express Gas Pipeline — Phase 215 km · Pipeline
Methane observations · within 25 km
- 2,438 kg/hr · offshore platform2021-11-02 · 24 km
- 1,485 kg/hr · offshore platform2021-11-02 · 24 km
- 570 kg/hr · offshore platform2021-11-02 · 24 km
- 155 kg/hr · offshore platform2021-11-02 · 23 km
- 97 kg/hr · offshore platform2021-11-02 · 23 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)