Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Eilat FLNG Terminal
Largest lng terminal in Israel of 4 · top 36% worldwide (#411 of 1,166)
- Owner
- Eilat Ashkelon Pipeline Co, Israel Natural Gas Pipelines Co
- Status
- idle
- Capacity
- 5.14 Mtpa
- Retired
- 2016
- Direction
- export
- Commodity
- lng
Comparable lng terminals · Israel · 4 ranked
- #1Eilat FLNG Terminal5.14 Mtpa
- #2NewMed FLNG Terminal5.14 Mtpa
- #3Hadera FSRU Terminal3.8 Mtpa
Co-located infrastructure · within 25 km
- Aqaba Special Economic Zone solar farm5.9 km · Power Plant · 530 MW · solar
- Egypt–Jordan Interconnector7.4 km · Transmission Line
- 400 kV line13 km · Transmission Line
- 500 kV line13 km · Transmission Line
- Arab Gas Pipeline — Taba-Aqaba Sea Gas Pipeline18 km · Pipeline
- Aqaba power plant19 km · Power Plant · 390 MW · gas
- Sheikh Sabah LNG Terminal19 km · LNG Terminal · 5.48 Mtpa
- Aqaba Jordan FSRU19 km · LNG Terminal · 3.8 Mtpa
- Masdar-Jordan wind farm20 km · Power Plant · 1.0 GW · wind
On the interactive map
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)