Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Coastal Bend LNG Terminal
7th-largest lng terminal in United States of 162 · top 3% worldwide (#28 of 1,166)
- Owner
- Coastal Bend LNG LLC
- Status
- proposed
- Capacity
- 22.5 Mtpa
- Direction
- export
- Commodity
- lng
Comparable lng terminals · United States · 162 ranked
- #1Sabine Pass LNG Terminal30.4 Mtpa
- #5Corpus Christi LNG Terminal24 Mtpa
- #6Main Pass Energy Hub FLNG Terminal24 Mtpa
- #7Coastal Bend LNG Terminal22.5 Mtpa
- #8Sabine Pass LNG Terminal20 Mtpa
- #9Plaquemines LNG20 Mtpa
Co-located infrastructure · within 25 km
- Port of Corpus Christi Coal Terminal1.1 km · Export Terminal
- Port of Corpus Christi Coal Terminals2.0 km · Export Terminal
- Corpus Christi energy center2.8 km · Power Plant · 593 MW · gas
- South Texas NGL Pipeline System3.2 km · Pipeline
- Nueces Bay power station3.5 km · Power Plant · 730 MW · gas
- South Texas LNG Terminal4.8 km · LNG Terminal · 8 Mtpa
- Cactus II Oil Pipeline — Taft Connector6.5 km · Pipeline
- Corpus Christi Refinery6.6 km · Refinery · 380 kb/d
- Papalote Creek wind farm9.5 km · Power Plant · 380 MW · wind
- LyondellBasell Corpus Christi Chemical Complex14 km · Chemical Plant
- Corpus Christi LNG15 km · LNG Terminal · 15 Mtpa
- Whitepoint Substation16 km · Substation / Converter
Methane observations · within 25 km
- 291 kg/hr · wellpad2022-06-07 · 13 km
- 263 kg/hr · wellpad2022-06-09 · 13 km
- 150 kg/hr2022-06-09 · 8.1 km
- 107 kg/hr · wellpad2022-06-09 · 14 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)