Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Brass LNG Terminal
8th-largest lng terminal in Nigeria of 20 · top 37% worldwide (#422 of 1,166)
- Owner
- Brass LNG Ltd
- Status
- idle
- Capacity
- 5 Mtpa
- Retired
- 2019
- Direction
- export
- Commodity
- lng
Comparable lng terminals · Nigeria · 20 ranked
- #1Bonny Island LNG22 Mtpa
- #6Olokola LNG Terminal5.5 Mtpa
- #7Brass LNG Terminal5 Mtpa
- #8Brass LNG Terminal5 Mtpa
- #9Nigeria LNG Terminal4.2 Mtpa
- #10Nigeria LNG Terminal4.1 Mtpa
Co-located infrastructure · within 25 km
- Brass LNG Terminal0 m · LNG Terminal · 5 Mtpa
- Eni Kwale-Brass Oil Pipeline Network896 m · Pipeline
- Ogoda-Brass Oil Pipeline896 m · Pipeline
- Tebidaba-Brass Oil Pipeline896 m · Pipeline
- Barracuda Oil Field (Nigeria)9.3 km · Oil & Gas Field
- HA Oil and Gas Field (Nigeria)18 km · Oil & Gas Field
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)