Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Bojonegara LNG Terminal
4th-largest lng terminal in Indonesia of 41 · top 22% worldwide (#249 of 1,166)
- Owner
- PT Pertamina (Persero), Kalla Group
- Status
- idle
- Capacity
- 7 Mtpa
- Retired
- 2018
- Direction
- import
- Commodity
- lng
Comparable lng terminals · Indonesia · 41 ranked
- #1Bontang LNG22.5 Mtpa
- #2Tangguh LNG11.4 Mtpa
- #3Abadi LNG Terminal9.5 Mtpa
- #4Bojonegara LNG Terminal7 Mtpa
- #5Tangguh LNG Terminal3.8 Mtpa
- #6Tangguh LNG Terminal3.8 Mtpa
Co-located infrastructure · within 25 km
- Merak power station968 m · Power Plant · 120 MW · coal
- Banten Serang power station1.1 km · Power Plant · 660 MW · coal
- 500 kV line1.3 km · Transmission Line
- SUTET 500kV LBE - Suralaya Baru1.9 km · Transmission Line
- SUTET 500kV Suralaya Baru - Suralaya2.2 km · Transmission Line
- Banten Suralaya power station2.9 km · Power Plant · 6.0 GW · coal
- Suralaya Coal Terminal3.0 km · Export Terminal
- Conch Cement Serang Cement Plant3.1 km · Cement Plant
- Sun Fook Serang Cement Plant9.5 km · Cement Plant
- LOTTE Chemical Cilegon Chemical Plant12 km · Chemical Plant
- INEOS Cilegon Chemical Plant12 km · Chemical Plant
- GITET CIlegon Baru12 km · Substation / Converter
On the interactive map
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)