- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Cement Plant
Newberry Cement Plant
- Operator
- Summit Materials Inc
- Owner
- Argos USA LLC
- Status
- operating
- Capacity
- 1.6 Mt/yr
- Product
- blended
- Commissioned
- 1999
Co-located infrastructure · within 25 km
- Sabal Trail Gas Transmission Pipeline — Project Phase I13 km · Pipeline
- Deerhaven Renewable power station20 km · Power Plant · 116 MW · biomass
- Deerhaven Generating Station20 km · Power Plant · 422 MW · gas
- Deerhaven Generating Station20 km · Power Plant · 251 MW · coal
- United States (US-FLA-FPC) – United States (US-FLA-GVL) interconnection23 km · Interconnector · 62 MW
- United States (US-FLA-FPL) – United States (US-FLA-GVL) interconnection23 km · Interconnector · 73 MW
- Florida Gas Transmission Pipeline — Putnam Expansion Project25 km · Pipeline
On the interactive map
integrated · dry process
SOURCE: Global Energy Monitor · Global Cement & Concrete Tracker (CC BY 4.0)