Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Data Centre
Johor
- Operator
- Multiple (hyperscale buildout)
- Status
- operating
- IT load
- ~600 MW
Grid connection · within 50 km
- Nearest substation
- Ayer Rajah 400kV
- Its voltage
- 400 kV
- Distance
- 22 km
- Strongest line nearby
- 500 kV
- Substations in range
- 6
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- Senoko power station5.2 km · Power Plant · 3.3 GW · gas
- 1-Net5.7 km · Data Centre
- Kranji Reservoir floating solar farm7.1 km · Power Plant · 150 MW · solar
- Global Switch8.0 km · Data Centre
- Pasir Gudang (YTL) power station14 km · Power Plant · 404 MW · gas
- LOTTE Chemical Titan Pasir Gudang Chemical Complex16 km · Chemical Plant
- Google Singapore DC16 km · Data Centre
- Malayan Cement Pasir Gudang 2 Cement Plant18 km · Cement Plant
- Esteel Eden Flame Johor steel plant18 km · Iron & Steel Plant
- Malayan Cement Pasir Gudang 1 Cement Plant18 km · Cement Plant
- YTL Slag Cement Pasir Gudang Cement Plant18 km · Cement Plant
- Tata Steel Jurong steel plant21 km · Iron & Steel Plant
On the interactive map
SOURCE: Industry market estimates (approx.)