Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Data Centre
Jakarta
- Operator
- Multiple (colocation hub)
- Status
- operating
- IT load
- ~350 MW
Grid connection · within 50 km
- Nearest substation
- GIS Kandang Sapi
- Its voltage
- 500 kV
- Distance
- 12 km
- Strongest line nearby
- 500 kV
- Line operator
- Perusahaan Listrik Negara
- Substations in range
- 13
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- Yellowstone Data Center1.6 km · Data Centre
- EDGE21.7 km · Data Centre
- Jakarta wind farm1.8 km · Power Plant · 597 MW · wind
- BGG Coal Mine2.1 km · Coal / Uranium Mine
- Equinix4.2 km · Data Centre
- 500 kV line4.9 km · Transmission Line
- PCS Coal Mine5.4 km · Coal / Uranium Mine
- KRU Coal Mine6.1 km · Coal / Uranium Mine
- Master Steel Jakarta Steel plant8.3 km · Iron & Steel Plant
- Jakarta Prima Steel Industries plant9.6 km · Iron & Steel Plant
- Tanjung Priok power station11 km · Power Plant · 2.8 GW · gas
- GIS Kandang Sapi12 km · Substation / Converter
On the interactive map
SOURCE: Industry market estimates (approx.)