Data Centre

Cape Town

South Africa

Operator
AWS / Teraco
Status
operating
IT load
~150 MW

Grid connection · within 50 km

Nearest substation
Acacia Park Substation
Its voltage
400 kV
Distance
12 km
Strongest line nearby
765 kV
Substations in range
7

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Portfolio

SOURCE: Industry market estimates (approx.)