Data Centre

Mistral / MGX Campus

France

6th-largest data centre worldwide · top 43% worldwide (#6 of 14)

Operator
Mistral AI / MGX / Nvidia
Status
proposed
Capacity
1,400 MW
Commissioned
2027

Comparable data centres · worldwide · 14 ranked

Grid connection · within 50 km

Its voltage
400 kV
Distance
10.0 km
Strongest line nearby
400 kV
Line operator
RTE
Substations in range
5

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Portfolio

Essonne · large French AI campus (Bpifrance/MGX)

SOURCE: Public reporting / operator announcements (approx.)